2026 BMW M4 Competition xDrive at BMW MINI of El Paso
https://mini.dealerleads.com/cars/Used/2026/BMW/M4/Competition+xDrive/173107762026 BMW M4 Competition xDrive
Selling Price : $91,915
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 2,233
- VIN : WBS33HK03TCW12771
- Stock # : TCW12771
- Engine : 3.0L Straight 6 Cylinder Engine
- Transmission : 8-Speed A/T
- Ext. Color : Isle of Man Green Metallic
- Int. Color : Kyalami Orange/Black
- Vehicle Type : Coupe
- Body Style : 2dr Car
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- 453
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
Additional Info
Competition xDrive trim. Excellent Condition, GREAT MILES 2,233! Heated Leather Seats, Nav System, Back-Up Camera, Power Liftgate, Aluminum Wheels, Turbo Charged Engine, FRONT VENTILATED SEATS, All Wheel Drive.KEY FEATURES INCLUDE
Leather Seats, Navigation, All Wheel Drive, Power Liftgate, Back-Up Camera
OPTION PACKAGES
FRONT VENTILATED SEATS.
WHY BUY FROM US
Buy with confidence at Group 1 where every pre-owned vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile exchange policy. Some exclusions may apply, see Buyers Guide for specifics. Every vehicle is priced to market and includes a Carfax History Report.
MARKET-BASED PRICING
You expect fair & competitive pricing. Thats why the price is based on current market data and is regularly compared to similar pre-owned vehicles in the region.
QUALITY INSPECTIONS
Every vehicle is thoroughly inspected and comes with a complimentary vehicle history report.
QUICK & TRANSPARENT FINANCING
Need Financing? Apply in minutes with all terms and conditions clearly disclosed upfront.
VEHICLE SERVICE CONTRACTS
Avoid bumps in the road! Adding a service contract can help prevent future unexpected expenses from arising. Available for most purchases.
PURCHASE WITH CONFIDENCE
CARFAX 1-Owner AutoCheck One Owner
WHO WE ARE
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.
Please confirm the accuracy of the included equipment by calling us prior to purchase.