BMW MINI of El Paso

6318 Montana Ave El Paso, TX 79925

2023 BMW M4 Competition xDrive at BMW MINI of El Paso

2023 BMW M4 Competition xDrive

Selling Price : $72,925

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 24,209
  • VIN : WBS33BA04PCL76569
  • Stock # : PCL76569
  • Engine : 3.0L Straight 6 Cylinder Engine
  • Transmission : 8-Speed A/T
  • Ext. Color : Portimao Blue Metallic
  • Int. Color : Silverstone/Black
  • Vehicle Type : Convertible
  • Body Style : Convertible
  • Drivetrain : AWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Additional Info

Clean, LOW MILES - 24,209! Navigation, Heated Leather Seats, Premium Sound System, Rear Air, All Wheel Drive, Turbo Charged, Aluminum Wheels, EXECUTIVE PACKAGE, PARKING ASSISTANCE PACKAGE, DRIVING ASSISTANCE PROFESSIONAL PACKA...

KEY FEATURES INCLUDE
Leather Seats, Navigation, All Wheel Drive, Rear Air, Premium Sound System

OPTION PACKAGES
DRIVING ASSISTANCE PROFESSIONAL PACKAGE Active Driving Assistant Pro, Extended Traffic Jam Assistant, For limited access highways, EXECUTIVE PACKAGE Remote Engine Start, Head-Up Display, Heated Steering Wheel, ICON ADAPTIVE LED HEADLIGHTS W/LASERLIGHT, CARBON FIBER TRIM, PARKING ASSISTANCE PACKAGE Parking Assistant Plus, WIRELESS CHARGING WiFi Hotspot, complimentary 3-month or 3GB trial, FRONT VENTILATED SEATS, Engine: 3.0L 6-Cylinder Twinpower Turbo, Back-Up Camera, Wheels: 19 X 9.5 Fr/20 X 10.5 Rr (Style 826M) -Inc: M Double-Spoke Bi-Color, Transmission: 8-Speed Steptronic Automatic, Headlights-Automatic Highbeams, M Sport Seats -Inc: Heated Front Seats, Power Front Seats.

WHY BUY FROM US
Buy with confidence at Group 1 where every pre-owned vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile exchange policy. Some exclusions may apply, see Buyers Guide for specifics. Every vehicle is priced to market and includes a Carfax History Report.

MARKET-BASED PRICING
You expect fair & competitive pricing. Thats why the price is based on current market data and is regularly compared to similar pre-owned vehicles in the region.

QUALITY INSPECTIONS
Every vehicle is thoroughly inspected and comes with a complimentary vehicle history report.

QUICK & TRANSPARENT FINANCING
Need Financing? Apply in minutes with all terms and conditions clearly disclosed upfront.

VEHICLE SERVICE CONTRACTS
Avoid bumps in the road! Adding a service contract can help prevent future unexpected expenses from arising. Available for most purchases.

PURCHASE WITH CONFIDENCE
CARFAX 1-Owner AutoCheck One Owner

BUY FROM AN AWARD WINNING DEALER
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.

Please confirm the accuracy of the included equipment by calling us prior to purchase.

Browse Other Vehicles at BMW MINI of El Paso

Dealership Info

MINI

BMW MINI of El Paso

BMW MINI of El Paso

Vehicle Features

  • 453
  • 4MC
  • 5AZ
  • 6NW
  • ZDY
  • ZPK
  • ZPX

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.