2026 BMW M4 Competition at BMW MINI of El Paso
https://mini.dealerleads.com/cars/New/2026/BMW/M4/Competition/164051452026 BMW M4 Competition
Selling Price : $93,900
Vehicle Basics
Additional Incentives
- Condition : New
- Mileage : 5
- VIN : WBS23HK06TCW14221
- Stock # : TCW14221
- Engine : 3.0L Straight 6 Cylinder Engine
- Transmission : 8-Speed A/T
- Ext. Color : Toronto Red Metallic
- Int. Color : Black
- Vehicle Type : Coupe
- Body Style : 2dr Car
- Drivetrain : RWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- 1MB
- 453
- ZDY
- ZPK
- ZPX
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
Additional Info
Heated Leather Seats, NAV, Premium Sound System, Back-Up Camera, Power Liftgate, Alloy Wheels, EXECUTIVE PACKAGE, PARKING ASSISTANCE PACKAGE, FRONT VENTILATED SEATS. Competition trim, Toronto Red Metallic exterior and Black interior.KEY FEATURES INCLUDE
Leather Seats, Power Liftgate, Back-Up Camera, Turbocharged, Premium Sound System
OPTION PACKAGES
DRIVING ASSISTANCE PROFESSIONAL PACKAGE Distance Control Assist (DCA) w/Steering Assistant, Driving Assistant Professional, Partial Automated Driving, Traffic Jam Assistant, EXECUTIVE PACKAGE Remote Engine Start, Live Cockpit Pro w/Navigation, Galvanic Controls, M DRIVE PROFESSIONAL, PARKING ASSISTANCE PACKAGE Parking View w/3D View (Surround View), Parking Assistant Plus, FRONT VENTILATED SEATS.
WHY BUY FROM US
Buy with confidence at Group 1 where every used vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile return policy. Every vehicle is priced to market and includes a Carfax History Report.
VISIT US TODAY
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.
Please confirm the accuracy of the included equipment by calling us prior to purchase.