2026 BMW M4 Competition xDrive at BMW MINI of El Paso
https://mini.dealerleads.com/cars/New/2026/BMW/M4/Competition+xDrive/166435142026 BMW M4 Competition xDrive
Selling Price : $111,830
Vehicle Basics
Additional Incentives
- Condition : New
- Mileage : 21
- VIN : WBS43BA03TCW85402
- Stock # : TCW85402
- Engine : 3.0L Straight 6 Cylinder Engine
- Transmission : 8-Speed A/T
- Ext. Color : Alpine White
- Int. Color : Silverstone/Black
- Vehicle Type : Convertible
- Body Style : Convertible
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
22
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- 1MB
- ZDY
- ZPK
- ZPX
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
Additional Info
Heated Leather Seats, NAV, Back-Up Camera, All Wheel Drive, Alloy Wheels, EXECUTIVE PACKAGE, PARKING ASSISTANCE PACKAGE, M DRIVE PROFESSIONAL, Turbo. Alpine White exterior and Silverstone/Black interior, Competition xDrive trim.KEY FEATURES INCLUDE
Leather Seats, All Wheel Drive, Heated Driver Seat, Back-Up Camera, Turbocharged
OPTION PACKAGES
DRIVING ASSISTANCE PROFESSIONAL PACKAGE Distance Control Assist (DCA) w/Steering Assistant, Driving Assistant Professional, Partial Automated Driving, Traffic Jam Assistant, EXECUTIVE PACKAGE Remote Engine Start, Live Cockpit Pro w/Navigation, Galvanic Controls, M DRIVE PROFESSIONAL, PARKING ASSISTANCE PACKAGE Parking View w/3D View (Surround View), Parking Assistant Plus.
WHY BUY FROM US
Buy with confidence at Group 1 where every used vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile exchange policy. Some exclusions may apply, see Buyers Guide for specifics. Every vehicle is priced to market and includes a Carfax History Report.
WHO WE ARE
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.
Please confirm the accuracy of the included equipment by calling us prior to purchase.