BMW MINI of El Paso

6318 Montana Ave El Paso, TX 79925

2026 BMW M4 at BMW MINI of El Paso

2026 BMW M4

Selling Price : $92,460

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : New
  • Mileage : 17
  • VIN : WBS13HK0XTCW45015
  • Stock # : TCW45015
  • Engine : 3.0L Straight 6 Cylinder Engine
  • Transmission : 6-Speed M/T
  • Ext. Color : Dravit Grey Metallic
  • Int. Color : Tartufo
  • Vehicle Type : Coupe
  • Body Style : 2dr Car
  • Drivetrain : RWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Additional Info

Heated Leather Seats, Nav System, Premium Sound System, Back-Up Camera, Power Liftgate, WHEELS: 19 X 9.5 FR/20 X 10.5 RR FORGED BLACK, EXECUTIVE PACKAGE. M Models trim, Dravit Grey Metallic exterior and Tartufo interior.

KEY FEATURES INCLUDE
Leather Seats, Power Liftgate, Back-Up Camera, Turbocharged, Premium Sound System

OPTION PACKAGES
WHEELS: 19 X 9.5 FR/20 X 10.5 RR FORGED BLACK Style 826M, M dual-spoke, Tires: 275/35R19 Fr & 285/30R20 Rr High Performance, Staggered, M DRIVE PROFESSIONAL, EXECUTIVE PACKAGE Live Cockpit Pro w/Navigation, Galvanic Controls, PARKING ASSISTANCE PACKAGE Parking View w/3D View (Surround View), Parking Assistant Plus, FRONT VENTILATED SEATS.

WHY BUY FROM US
Buy with confidence at Group 1 where every used vehicle, up to 175,000 miles, comes with a one month 1,000-mile limited warranty along with a 3-day 250-mile return policy. Every vehicle is priced to market and includes a Carfax History Report.

WHO WE ARE
BMW of El Paso is proud to be family owned and operated. Under current leadership of Group 1 Automotive, BMW of El Paso has a single vision: to introduce some the most technologically advanced and sophisticated vehicles in the world to the good people of El Paso, Las Cruces and the surrounding areas.

Please confirm the accuracy of the included equipment by calling us prior to purchase.

Browse Other Vehicles at BMW MINI of El Paso

Dealership Info

MINI

BMW MINI of El Paso

BMW MINI of El Paso

Vehicle Features

  • 1MB
  • 1U0
  • 453
  • ZPK
  • ZPX

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.